Sign In | Join Free | My frbiz.com |
|
Brand Name : Dongfang
Model Number : Type 510
Certification : ISO9001, CE
Place of Origin : Henan, China
MOQ : 1 SET
Price : Negotiable
Payment Terms : L/C, T/T
Supply Ability : 200 sets per year
Delivery Time : 60-120days
Packaging Details : Simple packaging; wooden box packaging
Product Name : Ripen Fresh Noodle Production Line
Width of Roller : 510mm
Number of Roller Pairs : 8 Pairs
Raw Material : Whear Flour
Feature : Fully Automatic
Control : Frequency Control, PLC
High Automation Ramen Noodle Equipment Fresh Noodle Making Machine SUS304
Ripen fresh noodles are half-cooked fresh noodles, usually rich in water. The taste of fresh noodles is close to homemade noodles. They are full of vitamins and nutrients and are healthier for the body.
Ripen Fresh Noodle Production Process:
The front parts of ripen fresh noodle equipment has many similarities with the traditional instant noodles. They also go through the processes of automatic flour feeding, continuous noodle mixing, ripen conveying, compound rolling, etc., and then enter the steamer. The steamed noodles are soaked for a period of time, the soaked noodles are loosened by a high-speed rotating drum, and then the oil is wiped on the noodles through the drop cloth curtain.
After a period of rest, the noodles are steamed for a second time for further maturation and sterilization. The noodles conveyed by the turning machine are cut to a certain length, and the cut noodles continue to move forward into the air cooling machine. After the noodles are fully cooled, they will be weighed and packaged.
Technical Parameters:
Product Name | Ripen Fresh Noodle Production Line |
Roller Width | 510mm |
Number of Roller Pairs | 8 Pairs |
Feature | Fully Automatic |
Raw Material | Whear Flour |
Control | Frequency Control, PLC |
FAQ:
1.When can I get an engineer from you?
When you have finished preparing the conditions (water, electricity, gas supply, production materials), contact our sales staff. We will send engineers to install your machine and train your staff to use it. Usually, when you are ready, you can contact our sales staff and cooperate with us to process the visa for the engineer, the engineer will arrive within 15 days.
2.How long does it take to install?
Depending on your machine order the machine size, we will send one to two engineers to your factory, which will take about 40 to 60 days.
High Automation Ramen Noodle Equipment Fresh Noodle Making Machine SUS304 Images |